MY字典>英语词典>cable length翻译和用法

cable length

英 [ˈkeɪbl leŋθ]

美 [ˈkeɪbl leŋθ]

链(英国608英尺,美国720英尺);电缆长度;线长;电线长度

英英释义

noun

双语例句

  • Soft cable length of arc furnace and the tension at its two end connectors
    电弧炉软电缆的长度和连接处的张力
  • The iterative calculation method of unstressed cable length has been successfully applied to pre-stress steel grid shell works of Jiangning Stadium.
    该迭代算法的无应力索长的计算方法在江宁体育场预应力钢网壳工程中已成功应用。
  • The principle error of the TDR cable length measurement has also been analyzed. The influence of measuring numbers, counting pulse frequency and traveling wave velocity on measuring accuracy is analyzed.
    分析了时域反射电缆测长的原理误差,研究了测量次数、计数脉冲频率、行波波速对测量精度的影响。
  • Place the units in their intended mounting locations to check the cable length and monitor installation conditions.
    把设备放入计划好的安装位置,检查电缆长度和监视器安装条件。
  • Measurement of the Coaxial Cable Length
    同轴电缆长度的测量
  • Starting from the pre-stressed state, the tension force was calculated by controlling the initial cable length.
    从预应力状态开始,通过控制索原长来追踪索在施工中的张拉力。
  • The results of simulation and engineering applications indicate that the wavelet de-noising processing with the decomposition level determined by the adaptive selection algorithm can effectively filter out the noise from the TDR signal and then improve the measuring accuracy of the TDR cable length measurement system.
    仿真结果和工程应用结果表明,采用该方法确定的小波分解层数对被测信号进行消噪处理,可以有效的滤除信号中的噪声,提高时域反射电缆测长系统的测量精度。
  • Under the conditions of given initial mid-span deflection, the cable length increment and load increment were obtained by means of the mid-span deflection increment.
    在给定初始跨中挠度的条件下,利用跨中挠度增量值求得索长增量值与载荷增量值;
  • Based on the parabola and catenary theories, calculation formulas on the cable length are summarized, and the precision is discussed.
    以抛物线和悬链线理论为基础,总结推导了悬索索长的实用计算公式,对各公式的计算精度进行了分析。
  • The calculation for construction control of the bridge is made with 3D Bridge program and the unstressed cable length method is used to control the final target status of the bridge in the spacial program.
    施工控制计算采用3DBridge进行,并在空间程序上利用无应力索长法控制斜拉桥最终目标状态。